Laughing Hyena
  • Home
  • Hyena Games
  • Esports
  • NFT Gaming
  • Crypto Trends
  • Game Reviews
  • Game Updates
  • GameFi Guides
  • Shop
Tag:

center

‘They're Not Breathing’: Inside the Chaos of ICE Detention Center 911 Calls
Gaming Gear

‘They’re Not Breathing’: Inside the Chaos of ICE Detention Center 911 Calls

by admin June 26, 2025


During visits in recent months, Emelie says her husband, who was detained at Stewart until he was deported last month, described severe overcrowding. “He told me once Trump took over, they were rolling out mats in the halls. People were sleeping out there.”

Emelie is a pseudonym granted for privacy. She says the conditions took a visible toll on her husband, who lost weight, grew increasingly anxious, and struggled to sleep amid the noise and tension. He described having to wait long stretches between meals. When her husband came down with the flu and spiked a high fever, she says, he filed multiple sick call requests, but never received care. “He had Covid-19 once,” she says. “Same thing. People would be sick and just left to get worse.”

“You don’t stand a chance at Stewart,” Emelie says, “It’s a death sentence for you and your family.”

When asked about overcrowding at Stewart, Todd told WIRED, “Everyone in our care is offered a bed.” But three attorneys who regularly visit the facility said their clients have consistently described sleeping on floors or in plastic containers fitted with thin mats. Three relatives of current and former detainees corroborated those accounts.

CoreCivic did not respond when asked how it defines a “bed.”

Scrambling to Cope

The consequences of overcrowding extend far beyond Stewart.

“We’re seeing a lot more transfers happening abruptly and frantically,” says Jeff Migliozzi, the communications director for the nonprofit Freedom for Immigrants, which runs the National Immigration Detention Hotline. “They’re scrambling.” Hotline calls more than doubled from 700 in December to 1,600 in March. Many go unanswered, Migliozzi says, because the lines are often too busy.

Dispatch data obtained from these detention facilities across the US reflect the surge. Six of the 10 facilities reviewed by WIRED experienced a sharp month-to-month spike in 911 calls at some point in 2025, with emergency dispatches more than tripling in certain cases. For example, nearly 80 emergency calls were placed from the remote South Texas ICE Processing Center between January and May. Logs show that the number of calls more than tripled in March, rising from 10 in February to 31. In one week, dispatchers fielded 11 separate calls at the facility, which is run by the GEO Group, one of the nation’s largest for-profit prison operators.

Migliozzi cautions that a rise in 911 calls doesn’t necessarily signal worsening conditions but may simply reflect a surging detainee population within an already dire system. Other experts noted a rise in calls could, hypothetically, signal that staff are getting quicker to call for help—though, conversely, a decline might just as easily point to delayed responses, not fewer crises

Three of the seven 911 calls obtained by WIRED involving suicide attempts this year came from the South Texas center: In February, a 36-year-old man swallowed 20 over-the-counter pills. In March, a 37-year-old detainee ingested cleaning chemicals. Two weeks later, a 41-year-old man was found cutting himself.

Immigration detention isn’t supposed to be punitive, says Anthony Enriquez, vice president of advocacy at Robert F. Kennedy Human Rights. “But the conditions of confinement in detention are so brutal,” he says, “that people have attempted suicide while waiting for their day in court.”



Source link

June 26, 2025 0 comments
0 FacebookTwitterPinterestEmail
CoinDesk News Image
NFT Gaming

Cipher Mining Begins Bitcoin Production at 300 MW Black Pearl Data Center

by admin June 23, 2025



Cipher Mining (CIFR) has begun bitcoin

production at its 300-megawatt (MW) Black Pearl facility in Texas, the company announced on Monday. The launch marks a key milestone for the firm, which now operates five active bitcoin mining data centers.

Phase I of the site, currently running at 150 MW, has reached an initial hashrate of 2.5 exahashes per second (EH/s). That number is expected to rise to 9.6 EH/s by the end of the third quarter, as new mining rigs arrive and replace older units. Once fully operational, Cipher’s total fleet will push toward a self-mining capacity of 23.1 EH/s.

The company delivered the site in 16 months and credits its operational discipline for maintaining low production costs amid industry volatility.

“We’re proud to be mining bitcoin ahead of schedule,” CEO Tyler Page said in a statement.

Cipher’s broader infrastructure strategy includes a 2.6 gigawatt (GW) pipeline that may serve both high-performance computing (HPC) clients and bitcoin mining.

As competition tightens in post-halving markets, scaling cheaply and quickly has become critical for public miners like Cipher trying to retain their edge.

CIFR declined 6.9% on Monday during regular trading. Shares are higher by 1.9% after hours.



Source link

June 23, 2025 0 comments
0 FacebookTwitterPinterestEmail
Bitcoin
Crypto Trends

Bitcoin Core Devs At Center Of Heated Debate

by admin June 8, 2025


Trusted Editorial content, reviewed by leading industry experts and seasoned editors. Ad Disclosure

According to a joint statement released on June 6, 2025, 31 Bitcoin Core developers have taken a clear stance on how the network should handle non-monetary uses. They stressed that their role is not to support or block data inscriptions and other non-financial activities.

The move has stirred strong feelings across the community, with debates touching on freedom, fees, and the very purpose of Bitcoin.

Developer Stance On Data Policies

Based on reports, the Core team said they won’t step in to stop “harmless” data from entering the blockchain. They pointed out that Bitcoin’s main strength is its resistance to censorship. So, any user-driven software choices must stand.

A statement on Bitcoin Core development and transaction relay policy – https://t.co/K4AaPPqTSD

— Bitcoin Core Project (@bitcoincoreorg) June 7, 2025

They made it plain: it’s up to node operators to pick what they accept. This approach aims to keep the network free, even if that means it carries extra data.

Community Voices Split

Following the statement, reactions poured in. Samson Mow, CEO of JAN3, called the developers’ tone hollow and said recent changes have “opened the floodgates” for spam. He argued that removing technical barriers encourages unwanted data.

Bitcoin Core devs have been changing the network gradually to enable spam and now seem focused on also removing barriers for spammers. It’s disingenuous to just say “it is what it is now, too bad.”

This statement itself is also inappropriate. Feels like an NYA from Core devs. https://t.co/ACIqyvK12f

— Samson Mow (@Excellion) June 7, 2025

On the flip side, Jameson Lopp of Casa praised the clear explanation of relay rules. Lopp pointed out that a unified voice from developers helps to cut down on past confusion over policy.

Recent Upgrade Sparks Worries

On May 8, 2025, Core developers removed a long-standing limit on transaction data size. That tweak lets anyone include bigger chunks of information in transactions. Critics worry this will drive up blockchain bloat and push fees higher.

BTC is now trading at $106,052. Chart: TradingView

Supporters say predicting what miners will include—and passing that info along—is key to keeping Bitcoin running smoothly. They claim this neutral relay policy helps miners and users alike, even if not everyone buys into it.

Future Forks And Layer Solutions

Looking ahead, some think a new fork could split off a “pure money” chain that blocks data inscriptions. Others foresee layer-2 networks or sidechains taking on the heavy lifting for art, messaging, and other uses.

Either way, most agree that wallets and node software will soon offer options: one for clean, finance-only transactions, and another for those who don’t mind extra data. This choice will let users vote with their settings instead of relying on developers to make the call.

Featured image from Unsplash, chart from TradingView

Editorial Process for bitcoinist is centered on delivering thoroughly researched, accurate, and unbiased content. We uphold strict sourcing standards, and each page undergoes diligent review by our team of top technology experts and seasoned editors. This process ensures the integrity, relevance, and value of our content for our readers.





Source link

June 8, 2025 0 comments
0 FacebookTwitterPinterestEmail
James Van Straten
Crypto Trends

CoreWeave Stock Soars on $7B Data Center Deal With Applied Digital

by admin June 4, 2025



CoreWeave’s (CRWV) stock surged 25% on Tuesday and climbing another 5% pre-market, bringing its year-to-date gains to a staggering 276%, following news of a $7 billion infrastructure deal with Applied Digital.

The AI cloud-computing startup signed two 15-year lease agreements with Applied Digital for 250MW of IT load at the Ellendale, North Dakota data center campus.

The first 100MW will go live in Q4 2025, followed by a 150MW facility in mid-2026. CoreWeave also holds options for up to 300MW of additional capacity.

Applied Digital’s Ellendale campus is designed to host 400MW of critical IT load and over 1GW of power capacity is under review.

CEO Wes Cummins hailed the agreement as a major step in cementing Applied Digital’s role in the AI and HPC infrastructure space.

The company recently secured $375 million in financing from SMBC to accelerate development. Investor optimism around AI demand continues to fuel CoreWeave’s meteoric rise.



Source link

June 4, 2025 0 comments
0 FacebookTwitterPinterestEmail
CoinDesk News Image
NFT Gaming

Riot Platforms (RIOT) Taps Data Center Veteran to Expand Beyond Bitcoin Mining

by admin June 2, 2025



Riot Platforms (RIOT) has hired industry veteran Jonathan Gibbs as its Chief Data Center Officer, marking a strategic move by the bitcoin miner to branch out beyond crypto into the broader data infrastructure business.

Gibbs brings over 15 years of experience and a résumé that includes designing and building more than one gigawatt of data center capacity across North America, Europe and Asia. He most recently served as Executive Vice President at Prime Data Centers, where he led projects across the U.S.

Now, he’s tasked with launching Riot’s new data center platform aimed at companies that require massive computing power to support cloud services and artificial intelligence. The company plans to build out non-bitcoin-focused facilities, leveraging 1.7 gigawatts of power capacity it already controls.

The company’s CEO, Jason Les, said the new initiative will “aggressively scale” to meet surging demand. If successful, Riot could join a growing list of former mining firms repositioning themselves as key players in the AI and cloud infrastructure boom.



Source link

June 2, 2025 0 comments
0 FacebookTwitterPinterestEmail
TSMC Lobby
Gaming Gear

TSMC to open up chip design center in Munich to help local chip developers

by admin May 28, 2025



TSMC is set to open its first chip design center in Munich, Germany, in a bid to help local and European chip developers optimize their designs to its process technology, the company announced at its European Technology Symposium in Amsterdam, the Netherlands.

The facility in Munich will perform multiple functions to simplify the implementation of chips on its process technologies, as well as helping partners on system-level design. Essentially, the center’s competencies will span from basic assistance in the development of tiny microcontroller units (MCUs) made using mature process technologies for the automotive industry to design technology optimization (DTCO) of advanced processors for AI and HPC applications that rely on leading-edge production nodes.

“We want to bring the best support to the European customer,” said Kevin Zhang, Deputy Co-COO and Senior Vice President of Business Development and Global Sales, at the event. “Here we want to have the design team to be able to directly work with the customer under our fab here, so we can bridge the product design and the manufacturing together. Lots of time we use the term DTCO — design technology co-optimization — [so that is what we are going to do in Munich].


You may like

The development center in Munich will be the company’s 10th facility of this kind, but the first one in Europe, which highlights the revival of European chip development in particular and the semiconductor industry in general. TSMC already has nine chip design centers across the world that are located in Canada, China, Japan, Taiwan, and the U.S.

In addition, the world’s largest contract maker of chips has Design Center Alliance (DCA) — a global network of companies — that provide chip implementation services as well as system-level design solutions. Ultimately, these companies can even design chips to order, something that TSMC’s own design centers are not meant to do.

TSMC — along with its partners Bosch, Infineon, and NXP — is currently building its first fab in Europe. The fab, which will be capable of building chips on TSMC’s N12 and N16 (12nm and 16nm-class), is mainly aimed at MCUs, but will certainly make other types of chips. To perform and yield optimally, all chips nowadays require design optimizations that may go beyond what EDA software offers, which is why TSMC needs its design center in Europe.

“It is not like you bring the technology there and you can do manufacturing for the rest of your life,” said Zhang. “That does not work that way. You need to work closely with your end customer to continue to make an improvement. So, by having a design team right here in the heart of the semiconductor land in Europe, we can bridge the customer and the technology manufacturing closer.”

Get Tom’s Hardware’s best news and in-depth reviews, straight to your inbox.

Follow Tom’s Hardware on Google News to get our up-to-date news, analysis, and reviews in your feeds. Make sure to click the Follow button.



Source link

May 28, 2025 0 comments
0 FacebookTwitterPinterestEmail
Apple is ready to replace Game Center with a more Xbox-like gaming app
Gaming Gear

Apple is ready to replace Game Center with a more Xbox-like gaming app

by admin May 28, 2025


Apple plans to announce an app focused on video games for the iPhone, iPad, Mac, and Apple TV at its Worldwide Developer Conference next week, according to Bloomberg. The app will let you launch games you’ve installed on your devices and serve as a hub for things like achievements and leaderboards.

Apple is expected to launch its gaming app alongside the next version of iOS this September, Bloomberg reports. It will apparently replace Apple’s Game Center, feature editorial content, and let you access games also available on the App Store. A 9to5Mac report from last year described the app as working similarly to the Xbox app for iPhone.

A Mac version of the new app will let users “tap into games downloaded outside of the App Store,” Bloomberg says.

Bloomberg’s report follows news that Apple bought its first gaming studio. The company confirmed to Digital Trends that it acquired RAC7, the two-person studio behind Sneaky Sasquatch, one of the first games released on its Apple Arcade games subscription service. RAC7 won’t be folding into any other teams at the company, but will instead continue to operate as a game studio all its own, according to Digital Trends.



Source link

May 28, 2025 0 comments
0 FacebookTwitterPinterestEmail
Oracle logo on building
Product Reviews

Oracle has reportedly placed an order for $40 billion in Nvidia AI GPUs for a new OpenAI data center

by admin May 24, 2025



Oracle has reportedly purchased about 400,000 Nvidia GB200 AI chips, worth about $40 billion, for deployment in Abilene, Texas. According to the Financial Times, this site will be the first to host the U.S. Stargate project —a $500 billion investment in AI infrastructure by OpenAI, Oracle, SoftBank, and Abu Dhabi sovereign wealth fund MGX that President Trump announced earlier this year.

Upon completion, the site is estimated to deliver up to 1.2 gigawatts of computing power, making it one of the most powerful data centers in the world and competing against Elon Musk’s Colossus in Memphis, Tennessee.

The project’s ownership is a bit complicated, though. The Abilene site is owned by Cruso, an AI infrastructure company, and Blue Owl Capital, a U.S. investment firm. Both have poured over $15 billion into the site through debt and equity financing.


You may like

The AI data center campus is approximately 875 acres and will have eight buildings. Construction began in June last year. Oracle will lease the Abilene site for 15 years, where it will deploy these AI chips. It will then lease this massive computing power to OpenAI, allowing it to use the AI chips to train its next-generation AI LLMs.

OpenAI has solely relied on Microsoft’s data centers for its computer power needs. However, it has since become frustrated with the setup, because the former’s demand was greater than what the latter could supply. So, the two decided to terminate their exclusive contract, allowing the AI pioneer to partner with other organizations for its processing power demands.

Interestingly, all these talks on equity and investments are commitments by the individual companies—the Financial Times said that Stargate itself has yet to commit any amount to a data center. Nevertheless, OpenAI recently also announced Stargate UAE, where it plans to deploy a 1GB cluster in Abu Dhabi in coordination with the U.S. government. The 5 GW data center will be built by G42 and is envisioned to utilize more than 2 million Nvidia GB200 chips.

All these AI data center deployments have helped Nvidia become one of the most valuable companies in the world, with Team Green hitting the number one spot (again) in late 2024. Aside from this $40 billion Oracle order, there has also been news that Elon Musk is raising cash to build Colossus 2, featuring a million GPUs. Other tech giants and even governments are trying to get in on the bandwagon, pushing the demand for the latest, most powerful AI chip through the roof.

Get Tom’s Hardware’s best news and in-depth reviews, straight to your inbox.

Follow Tom’s Hardware on Google News to get our up-to-date news, analysis, and reviews in your feeds. Make sure to click the Follow button.



Source link

May 24, 2025 0 comments
0 FacebookTwitterPinterestEmail
Inside Anthropic’s First Developer Day, Where AI Agents Took Center Stage
Product Reviews

Inside Anthropic’s First Developer Day, Where AI Agents Took Center Stage

by admin May 23, 2025


“Something like over 70 percent of [Anthropic’s] pull requests are now Claude code written,” Krieger told me. As for what those engineers are doing with the extra time, Krieger said they’re orchestrating the Claude codebase and, of course, attending meetings. “It really becomes apparent how much else is in the software engineering role,” he noted.

The pair fiddled with Voss water bottles and answered an array of questions from the press about an upcoming compute cluster with Amazon (Amodei says “parts of that cluster are already being used for research,”) and the displacement of workers due to AI (“I don’t think you can offload your company strategy to something like that,” Krieger said).

We’d been told by spokespeople that we weren’t allowed to ask questions about policy and regulation, but Amodei offered some unprompted insight into his views on a controversial provision in President Trump’s megabill that would ban state-level AI regulation for 10 years: “If you’re driving the car, it’s one thing to say ‘we don’t have to drive with the steering wheel now.’ It’s another thing to say ‘we’re going to rip out the steering wheel, and we can’t put it back in for 10 years,’” Amodei said.

What does Amodei think about the most? He says the race to the bottom, where safety measures are cut in order to compete in the AI race.

“The absolute puzzle of running Anthropic is that we somehow have to find a way to do both,” Amodei said, meaning the company has to compete and deploy AI safely. “You might have heard this stereotype that, ‘Oh, the companies that are the safest, they take the longest to do the safety testing. They’re the slowest.’ That is not what we found at all.”



Source link

May 23, 2025 0 comments
0 FacebookTwitterPinterestEmail
Fire Breaks Out at a Data Center Leased by Elon Musk’s X
Product Reviews

Fire Breaks Out at a Data Center Leased by Elon Musk’s X

by admin May 23, 2025


A fire broke out Thursday morning at a data center in Hillsboro, Oregon, leased by Elon Musk’s X, forcing an extended response from emergency crews, according to multiple sources who spoke to WIRED. The sources required anonymity as they aren’t authorized to speak publicly about the company.

Firefighters arrived at the Hillsboro Technology Park, in a suburb west of Portland, at 10:21 am, according to Hillsboro Fire and Rescue spokesperson Piseth Pich. They found a room with batteries that were deemed to be involved in the fire. Pich noted that the fire had not spread to other parts of the building, but said the room in question was heavy with smoke. As of 3:00 pm, the crew was still on the scene.

X did not immediately respond to a request for comment from WIRED. It could not be learned whether server operations at the data center had been affected by the incident.

Before Elon Musk bought Twitter, the company had three data centers in Sacramento, Portland, and Atlanta. This ensured that if one data center went down, traffic could be shifted to the other two—and split so no single data center was overwhelmed.

Around Christmas Eve 2022, Musk shut down X’s data center in Sacramento in an effort to cut costs. The company experienced a major outage in the wake of the shutdown. Over the next six months, the company moved more than 2,573 server racks from the Sacramento facility to data centers in Portland and Atlanta, according to internal documents.

In the Portland area, X appears to lease space from a building that has been linked to Digital Realty, one of the world’s largest developers of data centers. Digital Realty provides varying levels of operating support at its sites, which can have one or more tenants. It’s unclear if X shares this facility with other companies.

Ryan Young, vice president of Americas operations for Digital Realty, said in a statement to WIRED on Thursday evening that the “fire-related incident at our PDX11 facility” had been contained and that the fire department had left. “All personnel were safely evacuated, with no reported injuries,” Young stated. “We continue to monitor the situation, prioritizing the safety of our personnel, the integrity of the facility, and minimizing customer impact.”

Young declined to comment on customers.

Batteries often function as a backup power source at data centers. But lithium-ion varieties can be volatile, and issues with upkeep and inadequate safety measures have contributed to costly blazes at data centers around the world. Pich, the Hillsboro Fire Department spokesperson, says he could not recall any previous fire involving batteries in the Oregon region’s many other data centers.

X’s parent company, xAI, has taken criticism in recent months for its rapid expansion of power capacity at a new data center in Memphis, which opened last year. That facility, which Musk named Colossus, was built up at breakneck speed to train xAI’s Grok and other AI tools. The company installed more than 30 methane-powered gas turbines, but because the turbines are temporary, a federal permit for pollution control isn’t required, which appears to exploit a loophole in the Clean Air Act. The facility has drawn widespread criticism from surrounding Black and brown communities, who are already exposed to a large amount of air pollution and industrial emissions from other facilities in the area.

Update 5/22/25 11:03 ET: This story has been updated to include additional comment from Digital Realty.



Source link

May 23, 2025 0 comments
0 FacebookTwitterPinterestEmail
  • 1
  • 2

Categories

  • Crypto Trends (1,011)
  • Esports (760)
  • Game Reviews (692)
  • Game Updates (889)
  • GameFi Guides (1,002)
  • Gaming Gear (958)
  • NFT Gaming (985)
  • Product Reviews (946)
  • Uncategorized (1)

Recent Posts

  • Crypto Trader’s $2M social pressure campaign claims MEXC froze $3M for a year
  • Crypto Assets Can be Part of Diversified Portfolio, Japan’s Finance Minister Kato Says
  • The best air purifier for 2025
  • XRP Price to Make Major Move in Next 10 Days: Details
  • Love and Deepspace wins Best Mobile Game at gamescom, throws shade at you know what

Recent Posts

  • Crypto Trader’s $2M social pressure campaign claims MEXC froze $3M for a year

    August 25, 2025
  • Crypto Assets Can be Part of Diversified Portfolio, Japan’s Finance Minister Kato Says

    August 25, 2025
  • The best air purifier for 2025

    August 25, 2025
  • XRP Price to Make Major Move in Next 10 Days: Details

    August 25, 2025
  • Love and Deepspace wins Best Mobile Game at gamescom, throws shade at you know what

    August 25, 2025

Newsletter

Subscribe my Newsletter for new blog posts, tips & new photos. Let's stay updated!

About me

Welcome to Laughinghyena.io, your ultimate destination for the latest in blockchain gaming and gaming products. We’re passionate about the future of gaming, where decentralized technology empowers players to own, trade, and thrive in virtual worlds.

Recent Posts

  • Crypto Trader’s $2M social pressure campaign claims MEXC froze $3M for a year

    August 25, 2025
  • Crypto Assets Can be Part of Diversified Portfolio, Japan’s Finance Minister Kato Says

    August 25, 2025

Newsletter

Subscribe my Newsletter for new blog posts, tips & new photos. Let's stay updated!

@2025 laughinghyena- All Right Reserved. Designed and Developed by Pro


Back To Top
Laughing Hyena
  • Home
  • Hyena Games
  • Esports
  • NFT Gaming
  • Crypto Trends
  • Game Reviews
  • Game Updates
  • GameFi Guides
  • Shop

Shopping Cart

Close

No products in the cart.

Close